中新網(wǎng)
分享到:

Xinjiang completes 750 kV UHV power transmission project

分享到:

Xinjiang completes 750 kV UHV power transmission project

2024-09-01 12:09:57 來(lái)源:ECNS.cn
A 750 kilovolt ultra-high voltage (UHV) power transmission project, key to building a power transmission loop line around the Tarim Basin, in northwest China's Xinjiang Uyghur Autonomous Region has been completed, Aug. 28, 2024. (Photo/China News Service)A 750 kilovolt ultra-high voltage (UHV) power transmission project, key to building a power transmission loop line around the Tarim Basin, in northwest China's Xinjiang Uyghur Autonomous Region has been completed, Aug. 28, 2024. (Photo/China News Service)

(ECNS) -- A 750 kilovolt ultra-high voltage (UHV) power transmission project, key to building a power transmission loop line around the Tarim Basin, in northwest China's Xinjiang Uyghur Autonomous Region has been completed on Wednesday. It links power stations in Bazhou County, and Ruoqiang County of Bayingolin Mongol Autonomous Prefecture.

The project, running approximately 880 kilometers, has a total investment of 4.616 billion yuan with1,873transmission towers. Construction of the line started in March 2023 and it is expected to put into operation in November 2024.

It marks the first 750-kilovolt ultra-high voltage power transmission line across Xinjiang's desert railway.

The entire transmission line was built under harsh natural conditions in desert, lake, mountain, wetland and poplar forest protection area, including a 16.8-kilometer-long line through the Bosten Lake scenic area, 14.3 kilometers through the Taitem a Lake Wetland Park as well as 145.8 kilometers through the poplar forest.

Covering an area of 1.08 million square kilometers, the transmission line will be connected with another three operated power transmission projects, forming an ultra-high voltage loop network around Tarim Basin upon completion. It will greatly promote the development of new regional energy projects, facilitate new energy consumption, optimize energy allocation, and ensure power supplies.

【編輯:孫亭文】
《中國(guó)新聞》·大美新疆
本網(wǎng)站所刊載信息,不代表中新社和中新網(wǎng)觀點(diǎn)。 刊用本網(wǎng)站稿件,務(wù)經(jīng)書(shū)面授權(quán)。
未經(jīng)授權(quán)禁止轉(zhuǎn)載、摘編、復(fù)制及建立鏡像,違者將依法追究法律責(zé)任。
[網(wǎng)上傳播視聽(tīng)節(jié)目許可證(0106168)] [京ICP證040655號(hào)] [ 京公網(wǎng)安備 11010202009201號(hào)] [京ICP備05004340號(hào)-1] 總機(jī):86-10-87826688
制作:中新社新疆分社  技術(shù)支持:0991-8557237  新聞熱線(xiàn):0991- 8550318 / 8556479  
Copyright ©1999-2024 chinanews.com. All Rights Reserved